 |
| Newly registered Member |
Joined: Tue Aug 05, 2008 1:21 pm Posts: 5 Location: Berkshire Has thanked: 0 times Been thanked: 0 times
|
|
Fitting a bathroom for first time. About to put the suite in .
I want to tile under the sink pedestal & toilet eventually Do I pack out to the rough height that the 2 ply timber & tiles will be,so that I can remove later and tile under as the last job.
I am thinking that if I dont when I remove Toilet &Pedestal later to tile the plumbing will be too low.
Does that make any sense.Can someone put me straight
|
|