 Post subject: Replacement roof valley
PostPosted: Fri Mar 30, 2018 11:34 am 
Offline
Newly registered Member

Joined: Fri Mar 30, 2018 11:30 am
Posts: 1
Has thanked: 0 times
Been thanked: 0 times
Been charged £650 for a two man job to remove, replace and re-tile area around my roof valley. They have been and gone in an hour because they used a crane on back of lorry rather than scaffolding but still seemed expensive but other quotes were higher as scaffolding would be used. Does this price seem about right to you?


Share on FacebookShare on TwitterShare on DiggShare on DeliciousShare on Google+
Top
 Profile  
Reply with quote  
PostPosted: Fri Mar 30, 2018 11:45 am 
Online
Senior Member

Joined: Sat Sep 01, 2012 7:03 pm
Posts: 8395
Has thanked: 40 times
Been thanked: 1427 times
What colour hair have I?

You can't answer for the same reason we can not answer yours with a definitive answer. The "item" in question needs to be seen.
There are many varying factors, such as location, was the "crane" hired (or was it a cherry picker?) how many and what tiles were replaced, was anything else done the list goes on.
Its also too late in your case since the job has been done. Suppose some one on here said no thats too much what will you do? You can't really say some one on a forum who has no idea what has actually been done says that job is only £50 so here is £100

I had the valley changed as it leaked, it was zinc, its now lead, one man took around 3 days to do it and he had scaffolding we paid more than you.

_________________
Fret not, a forum is a collection of opinions. Above, are mine.

Which is correct? Metre or Meter? Click the link to find out more.

Working on anything electrical? have you got a multi meter? why not? Would you hit a nail with a shoe?

If gloom had a voice, it would be me. :mrgreen:

:idea1: How to post a picture on this forum Click here


Top
 Profile  
Reply with quote  
PostPosted: Fri Mar 30, 2018 6:47 pm 
Offline
Old School Chippie
User avatar

Joined: Mon Sep 12, 2011 4:27 pm
Posts: 6143
Location: Lancashire
Has thanked: 784 times
Been thanked: 1559 times
dommy82 wrote:
Been charged £650 for a two man job to remove, replace and re-tile area around my roof valley. They have been and gone in an hour because they used a crane on back of lorry rather than scaffolding

I have to admit it seems a tad excessive at first sight, but without being able to see some photos of the job it is difficult to say, especially as we don't know whereabouts in the country you are, what the access is like, whether permits are required (some councils charge you to use cherry pickers on the public highway as they are blocking parking spaces), congestion charges (high in London on commercial vehicles), materials costs (e.g lead, etc), etc. A cherry picker is actually a lot more expensive to hire or run than scaffolding towers, but both require extra insurance and appropriate training (at £200/day renewed every 3 to 5 years) and this needs to be factored into the price charged - so with that sort of kit you aren't going to be paying just a flat hourly rate for the operatives. In terms of price most firms and many small one-man bands tend to charge a minimum of 1/2 day whether the job takes 1 hour or 4 hours because with travel, traffic, etc the job they did may well be their only job that day

_________________
"The person who never made a mistake, never made anything" - Albert Einstein

"I too will something make, And joy in the making" - Robert Bridges, 1844~1930

"Success is 99% failure" - Soichiro Honda


Top
 Profile  
Reply with quote  
PostPosted: Fri Mar 30, 2018 7:25 pm 
Offline
Senior Member
User avatar

Joined: Sun Aug 18, 2013 8:04 pm
Posts: 7970
Location: Fife
Has thanked: 999 times
Been thanked: 1878 times
Couple of rolls of lead is around 200 quid,other materials and labour not to mention the cost of the cherry picker. Seems fair enough to me.
Would you rather they erected scaffold and it was more expensive?

_________________
Carpentry,I can explain it to you but I cannot understand it for you.


Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 4 posts ] 

 

 




Similar topics
   

Time zone: Europe/London


Who is online

Users browsing this forum: No registered users and 3 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Visit Solent plastics


 

 

 

News News Site map Site map SitemapIndex SitemapIndex RSS Feed RSS Feed Channel list Channel list
ultimatehandyman privacy policy

Contact

 

Powered by phpBB® Forum Software © phpBB Group

phpBB SEO