 Post subject: Bathroom refit
PostPosted: Tue Mar 09, 2010 6:20 pm 
Offline
Newly registered Member

Joined: Tue Mar 09, 2010 6:04 pm
Posts: 25
Has thanked: 0 times
Been thanked: 0 times
Sorry about the noobish nature of these questions. I'm just getting my head around a bathroom refit where i have to rip everything (including the floorboards) so I'm just back to walls, joists and pipes, and would appreciate some help to enable me to tackle things in the right order.

I'm OK with tiling and plumbing from working on my kitchen and various small scale DIY for family, but I'm looking at the bathroom suite and it's got me boggled. Most of the stuff I've read hasn't started from the "totally back to the plaster" scenario I'm in.

Couple of tiling questions.

[1] Do I secure the bath to the bare plaster wall, and then tile up from it toward the ceiling, then seal. Or do I tile the wall to below the bath rim height and go from there. I'm guessing it's got to be the former! (Probably obvious once you've fitted one!).

[2] Same deal with the wash basin. I'm going to be starting with floorboards and a plaster wall. I'm guessing I fit the basin to the plaster wall and then tile around it. No hang on, most of the weight is carried by the pedestal right, so it's not like it's hanging off the wall, maybe you can attach it to a tiled wall. Gah!


Top
 Profile  
 
 Post subject:
PostPosted: Tue Mar 09, 2010 7:30 pm 
Offline
Senior Member
User avatar

Joined: Sat Jan 10, 2009 3:49 pm
Posts: 6656
Location: hants/dorset border
Has thanked: 150 times
Been thanked: 508 times
Hi :welcome: to uhm, personally, I would fit the bath.,tile to the bath rim, but the washbasin tile behind where it's to go, (though not down to the floor....)you won't see that bit...unless you are vertically challenged :wink: others may have a different opinion..

_________________
.

If you feel you have benefited from the Free advice given on the Forum, Please consider making a donation to UHM's Nominated charity, read all about it and donate here :

http://www.donnasdreamhouse.co.uk/


__________________________________
__________________________________

Verwood Handyman
I Know it says I'm On-line, but I might have just left myself logged in, whilst I'm out....


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

 Post subject:
PostPosted: Tue Mar 09, 2010 7:46 pm 
Offline
Senior Member
User avatar

Joined: Mon Jul 31, 2006 11:34 pm
Posts: 1143
Location: South/West
Has thanked: 0 times
Been thanked: 1 times
Pipework and any cables run to correct positions.

Plaster walls.............Tank inside shower

Fit bath

Tile walls and floor

Fit lav/basin/towel rail

Christen Lavvy :thumbright:


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

 Post subject:
PostPosted: Tue Mar 09, 2010 7:48 pm 
Offline
Senior Member
User avatar

Joined: Tue Jul 15, 2008 11:15 pm
Posts: 815
Location: on my computer (obviously)
Has thanked: 5 times
Been thanked: 47 times
:welcome: uhoh personally i do em this order
1 first fix plumbing.
2 floor boards in
3 plaster walls
4 bath in
5 tile walls leaving the very bottom course off
6 tile floor
7 tile last course on walls
8 install basin and W/C
9 grout
10 silicone sealant

thats in an easy to write form but thats the basic order! obviously the firstfix plumbing has to take into account the thickness of tiles and such!

_________________
IF IT WERE EASY ITD B BORING!


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

 Post subject:
PostPosted: Tue Mar 09, 2010 8:00 pm 
Offline
Mr. Grumpy

Joined: Tue Nov 18, 2008 3:41 pm
Posts: 2415
Has thanked: 0 times
Been thanked: 32 times
Just to add, I have done a bathroom refit last year and as a novice I was a bit baffled too!.

To add to the lads above I would just point out that ...

I think its good to use an undertile bath sealer.I think they are a good idea. You can get flexible ones like Trimlux, seallux / homelux or whatever the names are called :wink:

Don't assume walls are straight, plumb level etc, i.e. don't start with a full tile in the corner

Test pipework if under the floor before you tile. Worth hiring a pressure test guage for a morning. I found a serious leak that way (seal on push fit was screwed!)

Above all, think, rethink and think again. Its simple to these yobbos here :lol: but as a novice you can make silly mistakes.

The wash-hand basin that hangs off the wall has a frame of sorts I think. I hate them anyway.


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

 Post subject:
PostPosted: Tue Mar 09, 2010 9:11 pm 
Offline
Newly registered Member

Joined: Tue Mar 09, 2010 6:04 pm
Posts: 25
Has thanked: 0 times
Been thanked: 0 times
Can't tell you all how grateful I am for your quick replies, I was losing sleep over it!


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

 Post subject:
PostPosted: Wed Mar 10, 2010 10:17 am 
Offline
Mr. Grumpy

Joined: Tue Nov 18, 2008 3:41 pm
Posts: 2415
Has thanked: 0 times
Been thanked: 32 times
Do one step at a tiome and ask questions along the way. Photos are immensley helpful for descibing your problem and or the pros to help!

Best of luck.

If you like a spot of DIY it should be ok to do. I had the same situation, back to unplastered walls and floor removed completely.

Made some silly mistakes which I regret in tiling & layout but more that happy to pass on my experience as a novice


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

 Post subject:
PostPosted: Wed Mar 10, 2010 8:08 pm 
Offline
Senior Member
User avatar

Joined: Sun Jan 24, 2010 7:36 pm
Posts: 209
Has thanked: 2 times
Been thanked: 6 times
marc1106 wrote:
:welcome: uhoh personally i do em this order
1 first fix plumbing.
2 floor boards in
3 plaster walls
4 bath in
5 tile walls leaving the very bottom course off
6 tile floor
7 tile last course on walls
8 install basin and W/C
9 grout
10 silicone sealant

thats in an easy to write form but thats the basic order! obviously the firstfix plumbing has to take into account the thickness of tiles and such!


I've recently done my ensuite and main bathroom and did it in this order :thumbright:


Top
 Profile  
 
You may not be able to see the full post including pictures unless you register or log in

Display posts from previous:  Sort by  
Post new topic This topic is locked, you cannot edit posts or make further replies.  [ 8 posts ] 


Similar topics
   

Time zone: Europe/London


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  


News News Site map Site map SitemapIndex SitemapIndex RSS Feed RSS Feed Channel list Channel list
ultimatehandyman privacy policy

Contact

 

Powered by phpBB® Forum Software © phpBB Group

phpBB SEO

 

Diy forum - Decking - plastering - Plumbing - DIY - Tiling