|
Page 1 of 1
|
[ 2 posts ] |
|
| Author |
Message |
|
Domboy77
|
Posted: Wed May 04, 2011 9:50 pm |
|
 |
| Newly registered Member |
Joined: Wed May 04, 2011 8:23 pm Posts: 5 Has thanked: 0 times Been thanked: 0 times
|
|
I am beginning work on my bathroom and will be tiling over the floor tiles rather than removing them. The issue is have is that one of the tiles was broken and was removed. If I am tiling over the existing tiles what should I do about the missing tile. Do I replace or fill first? Or do I just use more adhesive where the missing tile is?
Thanks in advance
|
|
| Top |
|
 |
|
royaloakcarpentry
|
Posted: Wed May 04, 2011 10:25 pm |
|
 |
| Senior Member |
Joined: Sun Jan 24, 2010 1:48 pm Posts: 4152 Location: Essex Has thanked: 2 times Been thanked: 327 times
|
|
I wouldn't tile over tile, so can't advise.
|
|
| Top |
|
 |
You may not be able to see the full post including pictures unless you
register or
log in
|
Page 1 of 1
|
[ 2 posts ] |
|