DIY Forum

 

Ultimate HandymanUltimate Handyman on Pinterest

 

DIY Forum/Home improvement advice forum

 

 

A-Z CONTENTS | DISCLAIMER | DIY VIDEO | HOME | SAFETY FIRST | FORUM RULES

It is currently Sat Oct 20, 2018 5:26 am
Visit Hilti


Time zone: Europe/London [ DST ]




 

 


Post new topic Reply to topic  [ 2 posts ] 
Author Message
PostPosted: Thu Apr 26, 2018 8:40 pm 
Offline
Senior Member

Joined: Sat Apr 19, 2014 6:27 pm
Posts: 469
Has thanked: 52 times
Been thanked: 102 times
In the past I have left it to builders to mix mortars, concrete footings, pointing of stone walling, etc. and don't know what they do, by their experience. The internet is a bit Greek on the subject.

Circumstances dictate that I have acquired use of a Belle Minimix 150 mixer & need to fill a rough trench for footings of a 6ft. stone wall, the builder is unavailable.

If I order a BAG of All-in-one (paperwork says 850kg) how many bags of Cement do I need, and how do I mix it .... ratios.... in simple terms of how many shovels of each and how many buckets of water?

Does a foundation need any additive?


Share on FacebookShare on TwitterShare on DiggShare on DeliciousShare on Google+
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 27, 2018 3:58 pm 
Offline
Senior Member
User avatar

Joined: Fri Feb 26, 2010 11:16 am
Posts: 1773
Location: Camberley Surrey
Has thanked: 101 times
Been thanked: 300 times
As a DIY watching and helping my Bricklayer build my wall; your aggregate is about 0.5 cu mtr and mix should be around 5:1 by volume so you need 0.1 cu mtr of cement which is about 140kg or 6x25kg bags.
Method: 5 shovel loads of aggregate into rotating mixer followed by 1 shovel of cement, start again 5 aggregate and then 1 cement until the mixer is comfortably loaded; have buckets of clean water ready and after a dry mix period slurp in until the mix is fairly dry still, it does not take a lot of water at this stage but the stew should not climb up the sides and yet not slosh at the bottom. Additive only in winter conditions.
Think you should wait for a Pro to add comment!
Is it 6ft high or long have you worked out the depth width of footing?


Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

 

 




Similar topics
   

Time zone: Europe/London [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Visit Solent plastics


 

 

 

News News Site map Site map SitemapIndex SitemapIndex RSS Feed RSS Feed Channel list Channel list
ultimatehandyman privacy policy

Contact

 

Powered by phpBB® Forum Software © phpBB Group

phpBB SEO