PostPosted: Wed Jul 19, 2017 5:35 pm 
Online
Senior Member

Joined: Fri Oct 30, 2009 5:39 pm
Posts: 171
Has thanked: 124 times
Been thanked: 1 times
Hi All,
I just wanted post these picture work done by who works for the housing association.

I just wanted your opinion, as friend of mine ask me and i said i can post it on the show case gallery and ask the Guys on the forum what they think.

I appreciated your reply


Attachments:
IMG_7078.JPG
IMG_7078.JPG [ 96.89 KiB | Viewed 1581 times ]
IMG_7067.JPG
IMG_7067.JPG [ 134.23 KiB | Viewed 1581 times ]
IMG_7066.JPG
IMG_7066.JPG [ 123.42 KiB | Viewed 1581 times ]
IMG_7063.JPG
IMG_7063.JPG [ 119.16 KiB | Viewed 1581 times ]
IMG_7054.JPG
IMG_7054.JPG [ 129.79 KiB | Viewed 1581 times ]
IMG_7053.JPG
IMG_7053.JPG [ 101.88 KiB | Viewed 1581 times ]
IMG_7051.JPG
IMG_7051.JPG [ 111.18 KiB | Viewed 1581 times ]
IMG_7070.JPG
IMG_7070.JPG [ 107.68 KiB | Viewed 1581 times ]
IMG_7069.JPG
IMG_7069.JPG [ 127.19 KiB | Viewed 1581 times ]
IMG_7046.JPG
IMG_7046.JPG [ 114.65 KiB | Viewed 1581 times ]
Share on FacebookShare on TwitterShare on DiggShare on DeliciousShare on Google+
Top
 Profile  
Reply with quote  
PostPosted: Thu Jul 20, 2017 8:20 pm 
Offline
Site Admin
User avatar

Joined: Sat Jul 16, 2005 8:06 pm
Posts: 23849
Location: Darwen, Lancashire
Has thanked: 1257 times
Been thanked: 1191 times
Have they laid the pavers on top of the existing drive?

How much did they pay for the work?

There are a few things that could have been better, but at least the pavers look level!

The Aco drain looks a mess as do the drainage gulley's and that man hole cover could be a lot better.

_________________
Check out our nominated charity


Top
 Profile  
Reply with quote  
PostPosted: Fri Jul 21, 2017 7:20 am 
Offline
Senior Member

Joined: Wed Feb 26, 2014 9:35 pm
Posts: 2449
Has thanked: 40 times
Been thanked: 552 times
If its work done for a HA then it's cosmetically fairly good but will last about 5 minutes longer than the contract is is for, we are having big problems here with work done, from the outside it looks alright but it's a bodge it and cover up job with PVC covering rotten wood work and possibly structural members.


Top
 Profile  
Reply with quote  
PostPosted: Sun Jul 30, 2017 8:55 pm 
Online
Senior Member

Joined: Fri Oct 30, 2009 5:39 pm
Posts: 171
Has thanked: 124 times
Been thanked: 1 times
Existing drive was dug up and added Mot stones added and then sharp sand, I am not sure how deep may be around 50mm to 100mm and sharp sand may be 50mm and whacker plate used. Where the car is parked this is the area it has been dug up and added the mot stones and sharp sand.

Then the flags laid by sharp sand and cement mixed and then flags laid butted together with other flags, so No pointing between the flags.

The side flagged was already tarmaced, so they laid flags on top of this, so No mot stones used.

They charged labour £1500 for flags and side fencing.

They were not going to put the concrete gutter, as thier intention was to fill it with chipping stones, but the house owner insisted in putting the concrete drains, as it was running slope down towards the house and they did not wanted the water hitting the brickwork first, so any rain water runs it would drain into the drains and from the side of the flags.

They messed up on the aco gutter and the some of the drainage gully area not finished well, as they could not be bothered anymore, wanted to finished the job. They should of cut the pipe and placed a shoe ,so the rain water would of drained into to aco gutter.


Top
 Profile  
Reply with quote  
PostPosted: Sun Jul 30, 2017 9:02 pm 
Online
Senior Member

Joined: Fri Oct 30, 2009 5:39 pm
Posts: 171
Has thanked: 124 times
Been thanked: 1 times
Picture before work


Attachments:
IMG_0182.JPG
IMG_0182.JPG [ 101.66 KiB | Viewed 1174 times ]
Top
 Profile  
Reply with quote  
PostPosted: Mon Jul 31, 2017 12:56 pm 
Online
Senior Member

Joined: Fri Oct 30, 2009 5:39 pm
Posts: 171
Has thanked: 124 times
Been thanked: 1 times
Previous picture before the work started.


Attachments:
2012.jpg
2012.jpg [ 131.99 KiB | Viewed 1136 times ]
Sept 2009.jpg
Sept 2009.jpg [ 122.76 KiB | Viewed 1136 times ]
May 2009.jpg
May 2009.jpg [ 146.84 KiB | Viewed 1136 times ]
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 6 posts ] 


Similar topics
   

Time zone: Europe/London


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Visit Hilti


 

 

 

News News Site map Site map SitemapIndex SitemapIndex RSS Feed RSS Feed Channel list Channel list
ultimatehandyman privacy policy

Contact

 

Powered by phpBB® Forum Software © phpBB Group

phpBB SEO