|
www.ultimatehandyman.co.uk Forum Index
-> Building Forum |
|
| Author |
Message |
Hinton Heating Gas/Heating Expert

Joined: 16 Jan 2006 Posts: 4296 Location: Bournemouth
|
Posted: Mon Feb 12, 2007 6:22 pm Post subject: |
|
|
|
look at that UHM has done the job already!  _________________ www.hintonheating.com
 |
|
| Back to top |
|
 |
|
|
 |
skiking Senior Member

Joined: 13 Sep 2006 Posts: 3086 Location: Cheshire
|
Posted: Mon Feb 12, 2007 6:45 pm Post subject: |
|
|
|
Its a great site this....you post a picture and ask advice. Not only do you get the advice it automatically does the work ...incredible technology . I'm just waiting for the next picture with the plasterboard on.....I'll give it 5 mins!!
Hang on....this is a con....just looked at my kitchen, its still in a mess
Seriously tho', thanks for the advice . Clearly I've not thought this thru' properly  |
|
| Back to top |
|
 |
ultimatehandyman Site Admin

Joined: 16 Jul 2005 Posts: 9740 Location: Darwen, Lancashire
|
Posted: Mon Feb 12, 2007 7:15 pm Post subject: |
|
|
|
If I wasn't so tired I would of put the plasterboard on the ceiling as well
I know why you don't want to remove the polysterene tiles, they are a pain in the butt to remove
That's why removing the wood strips and filling is probably the best option, infact see if you can get some more tiles and just stick them in the gaps, then overboard the lot. _________________ DIY | DIY Video |
|
| Back to top |
|
 |
|